New constructions, whether residential or commercial, often present unique challenges. Following are some guidelines to consider when thinking about construction:

1. Will power lines run above ground or underground?

2. If underground, does the current building plan consider underground conduit for power?

3. Will a temporary overhead power pole be needed during construction?

4. How will power line rights-of-way (above ground or underground) affect the property?

5. Is the construction site in a location that is already served with electricity, or will new distribution lines need to be run?